6/24/2023 0 Comments Mentor hyperlynx![]() ![]() We call the simulation virtual prototyping. ![]() The one extensively used now is the simulation. That means between the concept and the first model sale, no more than 6 months should be passing. A mobile, for instance, has a time to market of around 6 months and the tendency is to have it smaller than that. The big difference between various competitors is made at the moment by that we call the time to market. Thousands of equipment were developed and placed on the market. Getting back to electronics, this field faced in the last 20-30 years, a big boom in terms of technologies and opportunities. All of these define the cost of a discovery, developing process. Any discovery and science advance was taken tremendously amount of time, money, sometimes lives. The paper focuses on this thermal analysis solution capabilities for controlling temperature techniques on virtual prototypes of printed circuit boards by running what if scenarios.Ĭonsiderable resources have been used since the humans got interested to discover the world around. The designer experience can be used to control the board temperature but the significant amount of time and money on checking solutions is tremendously reduced by using HyperLynx Thermal, the thermal analysis solution provided by the Mentor Graphics Company. Metal mounting holes with their screw, radiators, fans and some other thermal transfer solutions might be instated. This kind of issue can be controlled using certain approaches. Combining the high frequency and high component density on most of current electronic designs, the generated temperature becomes a very important result of power consumption. As previous discussed, , signal integrity and power integrity analysis become more and more recommended for the current electronic designs developed around the world. Moving the design process from the real to the virtual world changed the engineering perspective on what can be done in less time. ![]() The electronics designing process exceeded the simple level of developing projects based on empirical approaches, when for every single change tremendous cost in time and money was spent in most of the cases.
0 Comments
Leave a Reply. |